NFPA 80 · NFPA 105 · PE.03.01.01 · K-tags
Why a program beats a once-a-year scramble
Most buildings test doors in a rush before a survey, test dampers when someone remembers, and find firestop problems when the surveyor lifts a ceiling tile. Each scramble costs more than steady work. A program spreads the work across the year, so nothing is ever overdue and your budget has no surprises.
What is in the program
Annual fire door inspection of every rated door, with same-visit fixes
Damper testing on a rolling cycle. We test a quarter of your dampers each year on a 4-year cycle (a sixth on a 6-year hospital cycle), so the cost is level and every damper stays current
Firestop survey by zone, with the riskiest barriers first
A pre-survey walk before your accreditation or state survey window
Repair pricing locked for the program year
One lead tech assigned to your buildings
Client portal with every opening, its history and its status
Priority response for citations: findings walked in 2 business days
Three program levels
Essentials
Complete
Portfolio
Best for
One building, doors only
One campus, all three barriers
3 or more sites
Fire doors
Annual
Annual
Annual
Dampers
—
Rolling cycle
Rolling cycle
Firestop
—
Zone survey
Zone survey
Pre-survey walk
—
Yes
Yes, each site
Account lead
Lead tech
Lead tech
Lead tech + account manager
Reporting
Report + portal
Report + portal
Portfolio dashboard
Pricing
Per door, yearly
Fixed yearly fee
Fixed yearly fee, per site
How it starts
Baseline. We inspect everything once and build your full inventory.
Plan. You get a 12-month calendar and a fixed price.
Run. We show up on schedule, fix what we find and keep your portal current.
Renew. Each year starts from your inventory, not from zero.